Construction Notice: Water Infrastructure Upgrade Project

Posted on November 14, 2023

Campus:  Hatfield Campus
 
Buildings and walkways affected:
Old Agriculture (Consumer Science), Mathematics, Botany, H14 Parking; Stoneman, Vetman, AE du Toit, Bateman, Van de Graaf, Mineral Sciences, Natural Sciences 2, College House, Engineering 1 and 2, and Tukkie Laan
 
Duration:  6 months
 
Dates:  10 November 2023 to 30 April 2024
 
Please take note of a planned water infrastructure upgrade project that will be affecting the buildings and walkways sections during the period as stated above.
 
The project will affect all of the above-mentioned buildings as we will be excavating next to the buildings for the installation of the new water pipeline.
 
We kindly urge all students and staff to be very careful around the barricaded areas and DO NOT cross any barricades as it is dangerous to you.
 
Thank you for your understanding.
 
Enquiries:
 
Deputy Director: Hendrick Rasebopye
Tel: 012 420 5756
Cell: 082 767 9581
 
Approved by:
 
Prof Susan Adendorff
Director: Facilities Management
- Author Hendrick Rasebopye

Copyright © University of Pretoria 2024. All rights reserved.

FAQ's Email Us Virtual Campus Share Cookie Preferences