Electrical supply interruption
Area: HATFIELD CAMPUS
Buildings affected: EMS Building, Conference Centre, Student Centre, Monastery Hall, and Tukkiewerf
Dates: 04th September 2022
Time: 08h00 to 16h00
Please take note of a planned bulk electricity infrastructure interruption for the installation and replacement of a problematic ATS 1 LV circuit breaker at the EMS building. This needs to happen in order to eliminate the changeover faults during the power outages.
The interruptions will affect all the buildings as stated above.
Please make sure that all the plugs and switches are turned off and treated as live.
Thank you for your understanding.