Water supply interruption Hatfield Campus Engineering 3 Building, University Road Entrance and Heavy Machinery Laboratories 17 September 2020

Posted on September 14, 2020

Water supply interruption
 
Area: Hatfield Campus
 
Buildings affected: Engineering 3 Building, University Road Entrance and Heavy Machinery Laboratories
 
Dates: 17 September 2020
Time:  11h00 to 14h00
 
Please take note of a planned bulk infrastructure interruption of the water supply to the abovementioned buildings and area.
 
The reason for the interruption is due to the leak flow tests to be executed on the main water supply pipelines.   
 
The specific date and time when the buildings will be affected are stated above.
 
Please fill all available containers with water before the interruption to supplement drinking and washing water and use water sparingly in buildings equipped with reservoir tanks.
 
Please do not leave taps turned on during the interruption as this may result in serious flooding and damage once the main water supply has been restored.
 
Thank you for your understanding.
 
Enquiries
Services Manager: Dr Gus Müller
Tel: 012 420 5756
Cell: 082 821 5833
 
 
Prof Susan Adendorff
Director: Facilities Management
- Author Ludolf van der Merwe

Copyright © University of Pretoria 2024. All rights reserved.

FAQ's Email Us Virtual Campus Share Cookie Preferences