Power supply interruptions: Hatfield Campus 23 September to 27 September 2019

Posted on August 16, 2019

Power supply interruptions: Hatfield Campus
Buildings affected: All buildings as detailed on the attached schedule
Dates: 23 September to 27 September 2019 
 
Please take note of planned interruptions of the power supply in the above-mentioned buildings.
 
The interruptions are due to scheduled statutory maintenance on the medium voltage infrastructure.
 
Buildings equipped with standby power generator will experience a power interruption of 60 seconds before and after the above-mentioned times.
 
Buildings that are not equipped with Standby Power Generator will experience power interruptions for the mentioned duration.
 
The specific dates and times when individual buildings will be affected are given in the attached schedule.
 
Please switch off sensitive electronic equipment well in advance and disconnect power leads from wall outlets.
 
We apologise for any inconvenience you may experience
 
Enquiries:
Services Manager: Corné Slabbert
Tel: 012 420 5756
Cell: 079 8956750
 
Prof Susan Adendorff
Director: Facilities Management
 
 
- Author Corne Slabbert

Copyright © University of Pretoria 2024. All rights reserved.

FAQ's Email Us Virtual Campus Share Cookie Preferences