Power supply interruptions: Hillcrest Campus: 6 -14 December 2018

Posted on November 28, 2018

Power supply interruptions: Hillcrest Campus
Buildings affected: All buildings as detailed in the attached schedule
Dates: 6 December to 14 December 2018 
 
Please take note of planned interruptions of the power supply in the abovementioned buildings.
 
The interruptions are due to scheduled statutory maintenance on the medium voltage infrastructure.
 
Buildings equipped with standby power generators will experience a power interruption of 60 seconds before and after the abovementioned times.
 
Buildings which are not equipped with standby power generators will experience a power interruption for the mentioned duration.
 
The specific dates and times when individual buildings will be affected are provided in the attached schedule.
 
Please switch off sensitive electronic equipment well in advance and disconnect power leads from wall outlets.
 
We apologise for any inconvenience you may experience
 
Enquiries:
Services Manager: Corné Slabbert
Tel: 012 420 5756
Cell: 079 8956750
 
Prof Susan Adendorff
Director: Facilities Management
 
- Author Corne Slabbert

Copyright © University of Pretoria 2024. All rights reserved.

FAQ's Email Us Virtual Campus Share Cookie Preferences