Power supply interruption: Hillcrest Campus, Visual Arts, 4 July 2018

Posted on July 03, 2018

Water supply interruption: Hatfield Campus
Buildings affected: Visual Arts Building
Date and time: Wednesday, 04 July 2018, 07:00 to 10:00
Duration: 3 hours
 
Please take note of a planned bulk infrastructure maintenance of the water supply to the abovementioned buildings and area.
 
The reason for the interruption, as given by the University of Pretoria, is scheduled maintenance/upgrading of the bulk water supply pipelines and equipment. The interruption is planned for Wednesday, 4 July 2018 from 07:00 to 10:00.
 
Please fill all available containers with water before the interruption, to supplement drinking and washing water and use water sparingly in buildings equipped with reservoir tanks.
 
Please do not leave taps turned on during the interruption as this may result in serious flooding and damage once the main water supply has been restored.
 
Thank you for your understanding.
 
Enquiries
Services Manager: Corné Slabbert
Tel: 012 420 5756
Cell: 079 8956750
 
 
Prof Susan Adendorff
Director: Facilities Management
- Author Corne Slabbert

Copyright © University of Pretoria 2024. All rights reserved.

COVID-19 Corona Virus South African Resource Portal

To contact the University during the COVID-19 lockdown, please send an email to [email protected]

FAQ's Email Us Virtual Campus Share Cookie Preferences