Water supply interruption: Hatfield Campus

Posted on May 10, 2016

Building affected: Heavy Machinery Laboratory A
Date and time: Saturday, 14 May 2016 from 09:00 to 15:00
Duration: 6 hours
 
Please take note of a planned interruption of the water supply to the building mentioned above.
 
The interruption is necessitated by maintenance on the building's water infrastructure pipelines. The interruption is planned for Saturday, 14 May 2016 from 09:00 to 15:00.
 
Please fill available containers with water before the interruption to supplement drinking and washing water and use water sparingly in buildings equipped with reservoir tanks.
 
Please do not leave taps turned on during the interruption as this may cause flooding and damage once the main water supply has been restored.
 
Enquiries:
Services Manager: Corné Slabbert
Tel: 012 420 5756
Cell: 079 895 6750
 
 
Prof Susan Adendorff
Director: Facilities Management
 
- Author Corne Slabbert/Prof Susan Adendorff

Copyright © University of Pretoria 2024. All rights reserved.

FAQ's Email Us Virtual Campus Share Cookie Preferences