Building affected: Asterhof Residence and Asterhof Kitchen
Date and time: Friday, 25 September 2015, 08:30 to 11:30
Duration: 3 hours
Please take note of a planned interruption of the power supply in the buildings referred to above.
The interruption is owing to planned maintenance on the medium voltage electrical equipment that supplies the abovementioned buildings with power. The interruption is planned for Friday 25 September 2015 from 08:30 to 11:30.
Please switch off sensitive electronic equipment timeously and disconnect power leads from wall outlets.
We apologise for any inconvenience you may experience.
Enquiries:
Services Manager: Corné Slabbert
Tel: 012 420 5756
Cell: 079 8956750
Prof Susan Adendorff
Director: Facilities Management
Get Social With Us
Download the UP Mobile App