Water supply interruption: Hatfield Campus

Posted on July 30, 2015

Buildings affected: Technical Service Building and Sci-Enza Centre
Date and time: Friday 31 July 2015 from 09:00 to 10:00
Duration: 1 hour
 
Please take note of a planned interruption of the water supply to the area and buildings referred to above.
 
The interruption is owing to the connection of a new temporary main water infrastructure supply pipe line that feeds the abovementioned buildings. The interruption is planned for Friday 31 July 2015 from 09:00 to 10:00.
 
Please fill available containers with water before the interruption to supplement drinking and washing water and use water sparingly in buildings equipped with water reservoir tanks.
 
Please do not leave taps turned on during the interruption as this may cause flooding and damage once the main water supply has been restored.
 
Enquiries:
Services Manager: Corné Slabbert
Tel: 012 420 5756
Cell: 079 8956750
 
 
Prof Susan Adendorff
Director: Facilities Management
 
- Author Corne Slabbert / Prof Susan Adendorff

Copyright © University of Pretoria 2024. All rights reserved.

FAQ's Email Us Virtual Campus Share Cookie Preferences