Power supply interruption: Hatfield Campus, Prinshof Campus (north and south) and Onderstepoort Campus

Posted on July 23, 2015

Building affected: All buildings equipped with standby power generators
Dates: 4 to 7 August 2015 
 
Please take note of planned interruptions of the power supply on the campuses and in the buildings referred to above.
 
The interruptions are required to do mains failure tests to ensure that the standby power generators will operate correctly in the event of municipal power outages. Occupants of buildings will experience a power interruption of 60 seconds before and after tests. Further details of the specific dates and times when particular buildings will be affected are detailed in the attached standby power generator test schedule.
 
Please complete all financial transactions ten minutes before the planned power interruptions.
 
Please leave electrical equipment switched on during tests.
 
We apologise for any inconvenience you may experience. 
 
Enquiries:
Services Manager: Corné Slabbert
Tel: 012 420 5756
Cell: 079 8956750
 
 
Prof Susan Adendorff
Director: Facilities Management
 
 
- Author Corne Slabbert / Prof Susan Adendorff

Copyright © University of Pretoria 2024. All rights reserved.

FAQ's Email Us Virtual Campus Share Cookie Preferences