Campuses: Hatfield Campus, LC de Villiers Sports Grounds, Prinshof Campus (north and south) and Onderstepoort Campus
Buildings affected: All buildings equipped with standby power generators
Dates: 2 July 2015 to 25 July 2015
Please note that there will be planned power interruptions from 2 to 25 July (during the winter recess) on the campuses and in the buildings mentioned above.
The interruptions are necessary in order to do planned maintenance on the low voltage boards of the standby power generators. If this maintenance is not done the low voltage boards may not function correctly during a municipal power outage, which will result in the extended periods without power.
Please note that no standby power will be available during maintenance procedures.
Please complete all financial transactions ten minutes before the planned power interruptions.
Please switch off sensitive electronic equipment timeously and disconnect power leads from wall outlets.
We apologise for any inconvenience you may experience.
Enquiries:
Services Manager: Corné Slabbert
Tel: 012 420 5756
Cell: 0798956750
Prof Susan Adendorff
Director: Facilities Management
Get Social With Us
Download the UP Mobile App