Power supply interruption: Onderstepoort Campus

Posted on May 13, 2015

Building affected: Veterinary Academic Hospital North
Date and time: Wednesday 13 Mei 2015, 17:00 to 22:00
Duration: 5 hours
 
Please take note of a planned interruption of the power supply in the building referred to above.
 
The interruption is required to connect a temporary standby power generator to the building while the faulty permanent standby power generator of the building is repaired. After the temporary generator has been connected numerous power interruptions will be experienced owing to its commissioning. The interruption is planned for Wednesday 13 May 2015 from 17:00 to 22:00.
 
Please complete all financial transactions ten minutes before the planned power interruptions.
 
Please switch off sensitive electronic equipment timeously and disconnect power leads from wall outlets.
 
We apologise for any inconvenience you may experience.   
 
Enquiries:
Services Manager: Corné Slabbert
Tel: 012 420 5756
Cell: 079 8956750
 
 
Prof Susan Adendorff
Director: Facilities Management
- Author Corne Slabbert / Prof Susan Adendorff

Copyright © University of Pretoria 2024. All rights reserved.

FAQ's Email Us Virtual Campus Share Cookie Preferences