Posted on December 02, 2014
Buildings affected: All buildings on the Hillcrest Residence Campus, LC de Villiers Sports Campus and Experimental Farm
Date and time: Monday 8 December 2014, from 09:00 to 15:00
Duration: 6 hours
Please take note of a planned interruption of the power supply to the areas and buildings referred to above.
The interruption is due to planned maintenance on the medium voltage infrastructure and verification of the electrical meters in the Maroela substation. Buildings equipped with standby power generators will experience a power interruption of 60 seconds when the power is switched off and another 60 second interruption when power is restored. The interruption is planned for Monday 8 December 2014 from 09:00 to 15:00.
Please switch off sensitive electronic equipment timeously and disconnect power leads from wall outlets.
We apologise for the inconvenience.