Power supply interruptions: Onderstepoort Campus
Buildings affected: All buildings as detailed on the attached schedule
Dates: 1 July to 5 July 2019
Please take note of planned interruptions of the power supply in the abovementioned buildings.
The interruptions are due to scheduled statutory maintenance on the medium voltage infrastructure.
Buildings equipped with standby power generator will experience a power interruption of 60 seconds before and after the abovementioned times.
Buildings which is not equipped with Standby Power Generator will experience a power interruption for the mentioned duration.
The specific dates and times when individual buildings will be affected, are given in the
attached schedule.
Please switch off sensitive electronic equipment well in advance and disconnect power leads from wall outlets.
We apologise for any inconvenience you may experience
Enquiries:
Services Manager: Corné Slabbert
Tel: 012 420 5756
Cell: 079 8956750
Prof Susan Adendorff
Director: Facilities Management
Get Social With Us
Download the UP Mobile App