Water supply interruption: Onderstepoort Campus

Posted on August 30, 2017

 
 
Building affected: Arnold Theiler Building 
Date and time: Saturday, 2 September 2017 from 07:00 to 14:00
Duration: 7 hours
 
Please take note of a planned interruption of the water supply to the abovementioned building and area.
The interruption is due to the installation of new firefighting equipment on the existing building main water infrastructure. The planned interruption is on Saturday, 2 September 2017 from 07:00 to 14:00.
 
Please fill all available containers with water before the interruption to supplement drinking and washing water and use water sparingly in buildings equipped with reservoir tanks.
 
Please do not leave taps turned on during the interruption as this may result in serious flooding and damage once the main water supply has been restored.
 
Thank you for your understanding.
 
Enquiries
Services Manager: Corné Slabbert
Tel: 012 420 5756
Cell: 079 895 6750
 
 
Prof Susan Adendorff
Director: Facilities Management
 
 
- Author Corne Slabbert

Copyright © University of Pretoria 2024. All rights reserved.

FAQ's Email Us Virtual Campus Share Cookie Preferences