Posted on February 17, 2017
Please take note of planned interruptions of the power supply in the abovementioned buildings.
The interruptions are due to scheduled statutory maintenance on the medium voltage infrastructure. The standby power generator will be in operation while the maintenance work is underway. Occupants of buildings will experience a power interruption of 60 seconds before and after the abovementioned times. The specific dates and times when individual buildings will be affected, are given in the attached schedule.
Please switch off sensitive electronic equipment well in advance and disconnect power leads from wall outlets.
We apologise for any inconvenience you may experience
Enquiries:
Copyright © University of Pretoria 2024. All rights reserved.
Get Social With Us
Download the UP Mobile App