Module code | PRX 321 |
Qualification | Undergraduate |
Faculty | Faculty of Engineering, Built Environment and Information Technology |
Module content | The importance of improved safety standards, cost effectiveness and productivity has driven technical mining personnel to examine all facets of their operations. Increasingly, it has been realized that an efficient drilling and blasting program will impact positively throughout the mining operation, from loading to maintenance, hauling to crushing, ground support to scaling and grade control to recover with an invariable increase in the overall profitability through technical advanced projects. Through the safe, efficient and innovative use of explosives for rock breaking the mining engineer will make a positive contribution to the overall mining operation. Due to the nature of the topics discussed in this module, a number of case studies are used to emphasise the safe handling, application and destruction of explosives. The Mine Health and Safety Act is dealt with and the Explosives Act receives specific attention. The module also covers aspects of non-explosive rock breaking and cutting. |
Module credits | 16.00 |
NQF Level | 07 |
Programmes | |
Prerequisites | MTX 221 GS |
Contact time | 2 tutorials per week, 3 lectures per week |
Language of tuition | Module is presented in English |
Department | Mining Engineering |
Period of presentation | Semester 2 |
Copyright © University of Pretoria 2024. All rights reserved.
Get Social With Us
Download the UP Mobile App