Buildings affected: Engineering 2 Building, CEFIM Building and Heavy Machinery Laboratories A and B 27 October 2017

Posted on October 20, 2017

Water supply interruption: Hatfield Campus
 
Buildings affected: Engineering 2 Building, CEFIM Building and Heavy Machinery Laboratories A and B
Date and time: Friday, 27 October 2017 from 09:00 to 14:00
Duration: 5 hours
 
Please take note of a planned interruption of the water supply to the abovementioned buildings.
 
The interruption is due to the installation of a new water meters and shut-off valves on the existing building water infrastructure. The planned interruption is on Friday, 27 October 2017 from 09:00 to 14:00.
 
Please fill available containers with water before the interruption to supplement drinking and washing water and use water sparingly in buildings equipped with water reservoir tanks.
 
Please do not leave taps turned on during the interruption as this may cause flooding and damage once the main water supply has been restored.
 
Enquiries
Services Manager: Corné Slabbert
Tel: 012 420 5756
Cell: 079 8956750
 
 
Prof Susan Adendorff
Director: Facilities Management
 
- Author Corne Slabbert

Copyright © University of Pretoria 2024. All rights reserved.

FAQ's Email Us Virtual Campus Share Cookie Preferences