Power supply interruptions: Hatfield Campus, Hillcrest Campus and Experimental Farm

Posted on June 28, 2017

 
Buildings affected: All buildings as detailed on the attached schedule
Dates: 3 July to 12 July 2017 
 
Please take note of planned interruptions of the power supply in the abovementioned buildings.
 
The interruptions are due to scheduled statutory maintenance on the medium voltage infrastructure.
 
Buildings equipped with standby power generator will experience a power interruption of 60 seconds before and after the abovementioned times.
 
Buildings which are not equipped with Standby Power Generators will experience a power interruption for the mentioned duration.
 
The specific dates and times when individual buildings will be affected, are given in the attached schedule.
 
Please switch off sensitive electronic equipment well in advance and disconnect power leads from wall outlets.
 
We apologise for any inconvenience you may experience
 
Enquiries:
Services Manager: Corné Slabbert
Tel: 012 420 5756
Cell: 079 895 6750
 
 
Prof Susan Adendorff
Director: Facilities Management
 
 
- Author Corne Slabbert

Copyright © University of Pretoria 2024. All rights reserved.

FAQ's Email Us Virtual Campus Share Cookie Preferences